Details
| Component | |
| Clincker | 60% SR |
| Gypsum | ≤ 5% ( using to control setting time ) |
| GBFS Slag | 35% |
| Chemical Properties | |
| CL | ≤ 0.1 % (by weight) |
| So3 | ≤ 3.5% (by weight) |
| Physical & Mechanical properties | |
| Initial setting time | ≥ 60 min |
| Expansion | ≤ 10 mm |
| Compression resistance after 7 days | ≥ 10 N/mm2 |
| Compression resistance after 28 days | ≥ 42.5 N/mm2 & ≤ 62.5 N/mm2 |
| USAGE |
| All construction purposes |
| Construction in coastal areas |
| Mass concrete |
| Reinforced concrete |
| Plain concrete |
| Precast concrete |
| Finishing |
| Storage |
| In a dry place isolated from humidity and rain |
| Stack the cement bags off the floor on wooden pallets with an impermeable plastic sheet Cover |
| Maintain a space of 60 cm between exterior walls and the stacks |
| Stack the cement bags close to each other to reduce circulation of air |
| Stacking limit : 10 bags |
| Standard Specifications |
| In compliance with the Egyptian Standard Specification No. 4756-1/2013. |
| In compliance with the single European Specification No. 197-1/2011. |
Reviews
Write Your Own Review
AMREYAH CEMENT - El-Sahel Cement CEM II /B-S42.5 N
Out of stock
SKU
bm-02
- El-Sahel Cement
- CEM II /B-S42.5 N
- Initial setting time ( ≥ 60 min )
- Compression resistance after 7 days ( ≥ 10 N/mm2 )
- Compression resistance after 28 days ( ≥ 42.5 N/mm2 & ≤ 62.5 N/mm2 )
Estimated delivery in 4 weeks
Shipping to Great Cairo:Free-shipping
Sold & Shipping by our trusted vendors

- Order by phone or text us
- | +2 - 01114588803
- Do you need something in particular (quantity, dimensions, configurations, delivery, etc. ) ? Contact Us
